A major power outage occurred in Chile on February 25, 2025, disrupting services across 14 regions. The blackout began due to a failure in the transmission system and affected areas from Arica to Los Lagos. Authorities are investigating the cause, while essential services remain operational with backup power.
On February 25, 2025, a significant power outage impacted Chile, affecting regions from Arica in the north to Los Lagos in the south. The blackout initiated at 3:16 p.m. local time due to a failure in the power transmission system, disrupting service across 14 out of 16 regions, a span of over 3,100 kilometers. Although the precise cause is still under investigation, officials identified a disconnection in the 500-kilovolt transmission system in the Norte Chico region as a contributing factor.
Emergency agencies gathered to address the widespread outage, with the government ensuring that essential services maintained backup power. Interior Minister Carolina Toha reassured the population, emphasizing there was no evidence of deliberate interference, labeling the incident a “system failure” and calling for public composure. She asserted, “The service should be restored soon.”
Consequently, Santiago’s metro services were temporarily halted as evaluations of the outage’s full impact commenced. Various establishments, including shopping malls and stores, faced closures due to the lack of electricity. The situation called for immediate assessment to inform the public and restore operations efficiently.
In summary, the February 25 power outage in Chile was a major incident that affected a significant portion of the country, attributed to a fault in the power transmission infrastructure. Authorities are investigating the situation, while maintaining critical services and reassuring the public. The Interior Minister’s comments highlight the government’s response to ensure safety and restoration of services.
Original Source: english.news.cn